Light Rapid Transit

Light Rapid Transit
Client Project Description
Prasarana Malaysia Berhad Design, Manufacture, Supply, Testing and Commisioning of 140 Light Rail Vehicles & Upgrade Wayside Electrical and Mechanical Systems in Consortium with Bombardier Transportation. This shared project (65% Bombardier – Sahagun, Mexico; 35% Hartasuma – West Port, Malaysia) is to refurbish and deliver the Bombardier Innovia Metro 200.

Year : 2006

Prasarana Malaysia Berhad Design, Manufacture, Delivery, Testing & Commissioning and Warranty of 14 Sets of New 4-Car Trains, Upgrading of Wayside Systems and Other Related Works (Kelana Jaya Line) for Prasarana Malaysia Berhad in Consortium with Bombardier Transportation. This shared project (65% Bombardier – Sahagun, Mexico; 35% Hartasuma – West Port, Malaysia) is to refurbish and deliver the Bombardier Innovia Metro 300.

Year : Current

Prasarana Malaysia Berhad Design, Manufacture, Delivery, Testing & Commissioning of 12 Air Condition Second Class Coaches and 2 Air Condition Buffet Coaches & 2 Power Generated Cars for KTMB/Ministry of Transport Malaysia. This project is a collaboration with PT INKA to develop the FIRST “Made in Malaysia” Passenger Coaches which includes seating coaches, buffet coaches and power generated cars. The included latest features are Wifi, GPS, Passenger Information System and Infotainment on board.

Year : Current

Prasarana Malaysia Berhad Mid Life Refurbishment, Rectification, Overhaul, Coupling and other related works of the existing 2 car Trains (Kelana Jaya Line) for Prasarana Malaysia Berhad in Consortium with Bombardier Transportation. This project includes the fefurbishment and conversion of 22 x 2-cars Trains into 11 x 4 car Trains as well as the refurbishment of 12 x 2-car Trains (completed on 11 trains).

In March 2017, the BHC signed a Supplementary Agreement (SA) for additional scope of works that include:

  • Completion of Original MLR Scope of Works – Coupling & refurbishment of 22 x 2-car sets into 11 x 4-car Trains.
  • Coupling & refurbishment of the remaining 12 x 2-cars sets into 6 x 4-car Trains.
  • Overhaul works of all sub-systems of all 17 x 4-car Trains.
  • Supply of parts as per approved BoM for Overhaul works of all sub-systems of all 17 x 4-car Trains Construction of Off-site Facilities at Westport for above works.
  • Train logistics between Subang & Westport for 16 x 4-car Trains (excludes T01).
  • Supply of Onboard CCTV for all 17 x 4-car Trains.
  • Supply of BTE for ATC, APU & PCU.
  • Supply of dummy bogies x 20 sets – utilised during production Final Delivery in year 2020.

Year : Current

Prasarana Malaysia Berhad Design, Manufacture, Delivery, Testing & Commissioning and Warranty of 27 Sets of New 4 – Car Trains, Upgrading of Wayside and Other Related Works (Kelana Jaya Line) for Prasarana Malaysia Berhad in Consortium with Bombardier Transportation. This shared project (Bombardier – Plattsburgh, USA; 35% Hartasuma – West Port, Malaysia) is to refurbish and deliver the Bombardier Innovia Metro 300 with final delivery in 2022.

Year : Current